VIETNAM, DALAT CITY WATER SUPPLY REHABILITATION & EXTENSION PROJECT
|
17/10/2005 |
|
|
Grontmij | Carl Bro International will, in cooperation with the Vietnamese authorities be responsible for the following components: 1. Design, tender and construction supervision of work to be carried out by local contractors.
2. Deciding upon, estimating and/or calculating quantities, ordering and having delivered to site equipment, components and materials required for the project works.
3. Deciding upon, selecting, ordering and having delivered equipment to be provided under the project (most of which will be for immediate use during the design stage by the Water Company or by other public sector agencies in order to fulfil the project objectives).
4. Providing assistance, advice and in-service training to local members of the project consultants Dalat team and to the Water Company and other public sectors agencies assisted under the project.
The project will have 3 stages:
Design: 12 months (followed by a two month tendering period) Implementation: 18 months Consolidation: 10 months
Training will continue intermittently throughout both the design and implementation stages
Activities:
- leak detection, repairs and control
- distribution network modelling and calibration (survey and mapping)
- water treatment works rehabilitation (2) and water quality laboratory
- rehabilitation of bulk water pump stations and intake works
- repair of storage tanks
- installation of private and bulk water meters
- review billing system and carry out tariff study
- incentive scheme for poor households
|
|
|
|
|
|