|
Grontmij | Carl Bro International will, in cooperation with the Vietnamese authorities be responsible for the following components: 1. Design, tender and construction supervision of work to be carried out by local contractors. 2. Deciding upon, estimating and/or calculating quantities, ordering and having delivered to site equipment, components and materials required for the project works. 3. Deciding upon, selecting, ordering and having delivered equipment to be provided under the project (most of which will be for immediate use during the design stage by the Water Company or by other public sector agencies in order to fulfil the project objectives). 4. Providing assistance, advice and in-service training to local members of the project consultants Dalat team and to the Water Company and other public sectors agencies assisted under the project. (17-10-2005) |
|
|
|
The purpose of the programme is to develop sustainable operational capacity in the newly formed Department of Rural Water Supply (DRWS) and to select, prepare and implement about 250 community based water projects in the three northern oblasts (regions) of Naryn, Talas and Issyk-Kul. These three oblasts have a total population of 561.600 and contain about 390 villages. The goal is sustainable access to adequate and affordable water and sanitation, leading to improved health and quality of life for all including the most vulnerable. This includes (i) strengthening the new organisational set up for assisting rural communities in the Kyrgyz Republic to improve water supply and sanitation, (ii) Review, detailed design and implementation of 15 community based water supply and sanitation pilot projects and (iii) selection, preparation and implementation of about 250 community based water supply and sanitation projects. Total Contract price of works: USD 13 mill. (11-10-2005) |
|
|
|
Provision of membrane filter plants to act as barriers to Cryptosporidium at 6 no potable water source sites (flows in range 5 to 24 MLD) Provision of new and upgraded water treatment facility consisting of chlorination, contact, Ph correction , de-chlorination and transfer pumping. (24 MLD) Provision of emergency raw water storage facility (18m) to maintain supplies during periods of low raw water quality at 1 no treatment works within Dam at Clywedog. (15-08-2005) |
|
|
|
Lautrup water supply consulting engineering. Denmark. 2000-2005. (15-08-2005) |
|
|
|
Preparation of a feasibility study for Perm Vodokanal (Perm Water and Waste Water Treatment Plant). (23-08-2001) |
|
|
|
Water treatment plants and supply systems for two towns with a population of 20,000 and 200,000 people, respectively. Total project costs are USD 16.5 million. (15-08-1998) |
|
|